‘Minor failure’ located beneath road during Chilliwack repaving project
CHILLIWACK — Confirming what an online social media post alluded to over the weekend, a spokesperson for the City of Chilliwack says a minor failure occurred at a Chilliwack road paving project Friday.
On Friday evening, a Facebook user named Lacy Mae posted in Chilliwack Beware Crime and Safety that the three-way stop at Chilliwack River Road, Prairie Central Road and Young Road was closed. Mae said a flagger told the people she was with that the road collapsed.
A spokesperson for the City of Chilliwack has now confirmed that a “small depression” was observed during paving at the intersection.
“Thank you for your email. During the repaving works at Young Road, Chilliwack River Road and Prairie Central Road, a small depression in the road was observed, representing a minor failure below the road surface,” said Jaimie Tocher, communications assistant for the city, in an email to Fraser Valley Today.

